Concrete Driveways in Pflugerville, TX

New pours, full replacements, and resurfacing. Built on a sub-base that's actually prepped for Pflugerville's expansive clay — not just bladed flat and poured.

What We Install

  • New concrete driveways — full design, form, pour, finish
  • Driveway replacements — saw-cut, demo, haul-off, repour
  • Driveway extensions — third-car widening, RV pads, side parking
  • Driveway resurfacing — when the slab is structurally sound but the surface is shot
  • Stamped & colored driveways — when you want the look without losing the durability
  • Driveway approach replacement — the city-owned apron (we pull the Pflugerville permit)

What It Costs in Pflugerville

Every driveway is quoted on site. Final price depends on demo, sub-base condition, slope, and finish:

Standard broom-finish, 4" thickQuoted on site
5–6" thick (trucks, RV)Quoted on site
Stamped or coloredQuoted on site
Demo & haul-off existing slabQuoted on site
Clay-soil sub-base remediationQuoted on site

We also pour residential and small-commercial driveways in Tech Ridge, Walnut Creek, and Avery Ranch. Full cost breakdown →

Why Pflugerville Driveways Crack — And How We Prevent It

Pflugerville sits on Houston Black Clay — one of the most expansive soil types in Texas. It swells when wet and shrinks when dry, and the difference can be inches over a season. A driveway laid on unprepared clay is a driveway that will crack on a schedule you can predict.

1. Sub-base prep

We cut to depth, lay 4 inches of compacted base material, and moisture-condition before forming. Skipping this is how five-year cracks happen.

2. Control joints at the right spacing

Joints every 8 to 10 feet for a 4-inch slab. Concrete will crack — joints decide whether it cracks where you want or where it doesn't.

3. Slow cure under Texas sun

We cover and wet-cure for the first 7 days. Fast cure under 100°F is the #1 reason driveways spider-crack in central Texas.

Read the full guide: Concrete driveways on Pflugerville's clay soil →

The Process — Pour Day to Walk-Through

  1. On-site estimate (Day 0). 30-minute walk-through, measurements, soil notes, photos. Written quote inside 48 hours.
  2. Permits & HOA (1–2 weeks). If you need a Pflugerville driveway approach permit or HOA approval, we prepare the application and submit. See our Pflugerville permit & HOA guide.
  3. Demo & sub-base (Day 1). Saw-cut, break out, haul off old slab. Cut to depth, lay base, compact, moisture-condition.
  4. Form & rebar (Day 2). Set forms, lay rebar on chairs, double-check elevations and slopes.
  5. Pour day (Day 3). Truck arrives early. Pour, screed, bull-float, broom-finish, cut control joints. Crew on site through final finish.
  6. Cure (Days 4–10). Cover and wet-cure. Walking OK at 48 hours, driving at 7 days.
  7. Walk-through & warranty. Inspect with you. Written warranty handed over.

Driveway FAQs

How much does a concrete driveway cost in Pflugerville?

Full cost breakdown →

How thick should a concrete driveway be?

Four inches for passenger vehicles is the residential default. Five to six inches if trucks, RVs, or trailers will park on it. We use 4,000 PSI mix and #3 rebar on 16-inch centers as the residential baseline.

How long does a concrete driveway last?

Properly installed: 30–50 years in Central Texas. The three things that decide it: sub-base prep, control joint spacing, and slow cure under Texas sun. Done right, you replace it once a lifetime.

How long until I can drive on a new driveway?

Walking: 24–48 hours. Passenger car: 7 days. Heavy vehicles (trucks, RVs, equipment): 28 days for full cure.

Do I need a permit for a new driveway in Pflugerville?

A driveway approach permit is required from the City of Pflugerville whenever the work touches the public right-of-way (the apron from your slab to the street). Replacement on existing private driveway slabs generally doesn't require a permit. HOA approval is required in Stone Hill, Blackhawk, Falcon Pointe and several other communities — we handle the paperwork. Permit & HOA guide →

Can you match the look of my existing driveway?

For partial replacements and extensions, we match texture (broom, smooth, stamped) and color as closely as possible. New concrete will cure slightly lighter than old for 6–12 months before matching. We'll show you a sample before pour.

What about pier-and-beam foundation issues showing up at the driveway?

If your driveway is heaving because the house foundation is moving, you have a foundation problem, not a driveway problem. We'll point you to a foundation specialist — fixing the slab without addressing the cause is money down the drain.