Walkways, steps, side gates, and city sidewalk replacement. ADA-compliant pours and HOA submittals handled.
| Residential walkway, broom finish | Quoted on site |
| City sidewalk replacement | Quoted on site |
| Concrete steps (per step) | Quoted on site |
| Stamped or colored walkway | Quoted on site |
| Trip-hazard panel replacement | Quoted on site |
Pricing depends on size and site conditions — call for a free estimate.
3 ft for utility paths. 4 ft for front walkways (two people pass). 5–6 ft for grand entries or accessibility paths.
2% cross-slope (1/4" per foot) away from the house for drainage. Steeper than 5% running slope and you need handrails.
Control joints every 5–6 ft on a 4" walkway. Isolation joints where walkway meets house, driveway, patio.
If you're replacing or installing a sidewalk in the public right-of-way (the city-owned strip between your property line and the street), you need a City of Pflugerville sidewalk permit. We handle the application and submit.
Walkways inside your property line don't need a city permit, but most Pflugerville HOAs (Stone Hill, Blackhawk, Falcon Pointe) require ARC approval for new walkways. We prepare the package.
Pricing depends on size and site conditions — call for a free estimate.
3 ft for utility, 4 ft standard for front walkways (two people pass), 5–6 ft for main entrances or accessibility.
Yes for city sidewalk in the public right-of-way. No for private walkways inside your property line. HOA approval is usually required either way.
Yes. Saw-cut the joints, replace the bad panels. New concrete cures lighter than old for 6–12 months before matching.
For Central Texas: yes. No rot, no termites, no annual stain. Higher up-front, lower lifetime cost.
24–48 hours for foot traffic. 7 days for heavy loads (mowers, bikes).
Free on-site walk-through. We'll measure, ask about access and slope, and write a quote inside 48 hours.